Sorry I haven't updated. It's been a busy few days. We thought stone was going up on Friday and it did not. It should be done next week. The masons are a bit behind.
Friday and Saturday my husband did some more insulating. The first garage wall took him 2 hours until he got a system down. The other wall took about an hour. Then the bathroom insulation took another 2 hours. This was all spread out over 3 days when he had time. (The yellow insulation with the blue writing is what we bought. The contractor used the pink insulation with the pink writing.)
|
Laundry room |
|
Half bath |
Saturday, the contractors insulated the house. They spray foamed the areas near the windows and caulked the top and bottom of the exterior wall frames.
|
Garage |
|
Basement under the breakfast room |
The cardboard pieces are baffles to allow air from the sofits through the top. The 15" of blown insulation will go against it. This will let air circulate in the attic.